LNG Skid includes:
LNG submerged,LNG including pump pool,single pump or double pump,pneumatic stop valve,BOG vaporizer,storage tank booster,instrument
system,electronic control system,thermal insulation pipeline,packaging frame and LNG dispenser,etc.
The on-site installation is simple and convenient,what is needed to do is connecting the fluid inlet pipeline,air return pipeline,fluid outlet pipeline,
control cable and instrument air.
After the initial system precooling is finished,the system can be in standby ,working for 24 hours;liquid shall be filled in case it is operated.
Flow:12-25m³/h(single pump) Head:140-240m